CCNP switch overview
Cisco Certified Network Professional (CCNP®) validates the ability to plan, implement, verify and troubleshoot local and wide-area enterprise networks and work collaboratively with specialists on advanced security, voice, wireless and video solutions. Those who achieve CCNP have demonstrated the skills required in enterprise roles such as network technician, support engineer, systems engineer or network engineer. Upon finishing one will be ready to take 642-813 SWITCH: Implementing Cisco IP Switched Networks
Implementing Cisco IP Switched Networks (SWITCH 642-813) is a five-day day instructor-led course. The SWITCH 642-813 exam will certify that the successful candidate has important knowledge and skills necessary to plan, configure and verify the implementation of complex enterprise switching solutions using Cisco’s Campus Enterprise Architecture. The SWITCH exam also covers secure integration of VLANs, WLANs, voice and video into campus networks.
Upon finishing one will be ready to take 642-813 SWITCH: Implementing Cisco IP Switched Networks
Who should take this training?
Candidates who have completed their CCNA.
The IPGenius Advantage:
Candidates will have a hands-on on real Cisco devices. Modern Classroom with hi-tech delivery techniques. Candidates will be provided with hands-on lab workbook .
Convenient location for candidates who want in-class training. Our training centre is just minutes away from Toronto Airport.
Course Details 642-813 SWITCH
Implement VLAN based solution, given a network design and a set of requirements
• Determine network resources needed for implementing a VLAN based solution on a network
• Create a VLAN based implementation plan
• Create a VLAN based verification plan
• Configure switch-to-switch connectivity for the VLAN based solution
• Configure loop prevention for the VLAN based solution
• Configure Access Ports for the VLAN based solution
• erify the VLAN based solution was implemented properly using show and debug commands
• Document results of VLAN implementation and verification
Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
• Determine network resources needed for implementing a Security solution
• Create a implementation plan for the Security solution
• Create a verification plan for the Security solution
• Configure port security features
• Configure general switch security features
• Configure private VLANs Configure VACL and PACL
• Verify the Security based solution was implemented properly using show and debug commands
• Document results of Security implementation and verification
Implement Switch based Layer 3 services, given a network design and a set of requirements
• Determine network resources needed for implementing a Switch based Layer 3 solution
• Create an implementation plan for the Switch based Layer 3 solution
• Create a verification plan for the Switch based Layer 3 solution
• Configure routing interfaces Configure Layer 3 Security
• Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
• Document results of Switch based Layer 3 implementation and verification
Prepare infrastructure to support advanced services
• Implement a Wireless Extension of a Layer 2 solution
• Implement a VoIP support solution
• Implement video support solution
Implement High Availability, given a network design and a set of requirements
• Determine network resources needed for implementing High Availability on a network
• Create a High Availability implementation plan
• Create a High Availability verification plan
• Implement first hop redundancy protocols
• Implement switch supervisor redundancy
• Verify High Availability solution was implemented properly using show and debug commands
• Document results of High Availability implementation and verification